We used the landlord's criteria sheet as the baseline, produced MEP against existing mains, and submitted within ten business days of kickoff.
Light Commercial Tenant Improvement
Light commercial · Charlotte, NC · 2024
Permit drawings and MEP for a small office tenant improvement in a strip commercial building.
Overview
A developer needed fast turnaround on TI drawings for a 3,200 sq ft professional office suite including layout, MEP, and code path documentation.
- TypeLight commercial
- LocationCharlotte, NC
- Year2024
- Deliverables3
Project details
- Type
- Light commercial
- Location
- Charlotte, NC
- Year
- 2024
- Services
- Permit plan set · MEP design
- Scope
- 3,200 sq ft office tenant improvement
The Challenge
Landlord base building standards and a short lease commencement date required a compressed design and submittal schedule.
What We Delivered
- Architectural permit drawings
- MEP layouts
- Code compliance notes
Approach
Coordinated disciplines, jurisdiction research, and clear communication from kickoff through delivery.
— ResultCertificate of occupancy path cleared in one plan check cycle.
Project gallery
Related projects
Addition · Denver, CO
Second-Story Addition
Structural engineering and permit drawings for a second-floor expansion over an existing ranch home.
View case studyNew build · Austin, TX
Custom Single-Family Home
Full permit plan set with structural engineering and MEP for a 2,400 sq ft custom residence.
View case study
